Epoxy Resin Calculator screenshot

Epoxy Resin Calculator

Coating volume from an area and a thickness, split into part A and part B by the mix ratio you type.

Privacy First
0 Runs
Updated 2026-11-21
Runs in your browser
No sign-up, no upload

What the epoxy resin calculator does

It computes the volume a coating needs and then splits it by a mix ratio. Volume = area × thickness, and 1 m² × 1 mm = 1 L, so 20 m² at 2 mm is 40 L; a 10 % allowance makes it 44 L, and a 2:1 ratio gives 29.3333 L of part A and 14.6667 L of part B.

The ratio is the product's, not this page's. Two-part resins differ in ratio by volume and by weight, and a page that assumed one would be wrong for the next tin, so both parts are controls and the split is printed with the parts it used. Pot life, working time, exotherm and the maximum coat thickness are product properties the page does not know, which it states rather than implying a brand.

The coverage line is the reciprocal of the thickness in metres: 0.5 m² per litre at 2 mm, so a different thickness can be checked against a tin's label. A thickness outside 0.05 to 10 mm, a ratio part of zero or below, and a waste percentage outside 0 to 50 are refused by name.

Figures print to up to four decimal places with trailing zeros trimmed.

How to use it

Set Coated area in square metres and Coating thickness in millimetres.

Set the Mix ratio parts, one for part A and one for part B, and set Waste to the allowance you buy for.

Press Run. The result prints the volume, the volume with waste, both parts, the coverage per litre and the ratio it applied.

Worked example

Input with the defaults:

Area 20 m², thickness 2 mm, ratio 2:1, 10 % waste

Output:

Volume:        40 L (area × thickness)
With waste:    44 L (10 % allowance)
Part A:        29.3333 L (2 of 3 parts)
Part B:        14.6667 L (1 of 3 parts)

Why it runs in your browser

The volume and the split are computed in this tab. Your area and your ratio are never uploaded.

The page computes the volume a coating needs and splits it into the two parts of a mix. Volume = area × thickness, and 1 m² × 1 mm is 1 L, so 20 m² at 2 mm is 40 L; a 10 % allowance makes 44 L, and a 2:1 ratio gives 29.3333 L of part A and 14.6667 L of part B.

The mix ratio is a control because it is the product's: two-part resins differ by brand and by whether the ratio is by volume or by weight, and the page says the split is by volume.

Pot life, working time, exotherm and the maximum coat thickness are properties of the tin, and the page does not pretend to know them.

Volume is the bridge between area and litres

A coating is quoted in litres and measured by area and thickness, so the arithmetic is a volume: square metres times millimetres. One square metre covered one millimetre deep is a litre, which is why the numbers line up without a conversion constant, and the page prints the thickness in metres beside the millimetres to make the multiplication visible.

The coverage line is the reciprocal: 0.5 m² per litre at 2 mm. It is there so the answer can be checked against a tin's stated coverage, which is usually given at one thickness.

The ratio, and what the page leaves to the tin

A two-part epoxy cures because the two parts react, so the ratio is not a preference. The page takes both parts as whole ratios of the same unit — 2 and 1, or 3 and 1, or 100 and 45 — and splits the total volume in that proportion. It does not convert a weight ratio into a volume ratio, because that needs the two densities.

Pot life, the time you have to work, the exotherm of a thick pour, the maximum thickness per coat and the surface preparation are all product and process facts. The page lists them as outside its scope rather than implying a brand's data sheet.

How to use Epoxy Resin Calculator

Set Coated area in square metres and Coating thickness in millimetres.

Set the Mix ratio parts, one for part A and one for part B, then set Waste to the allowance you buy for.

Press Run. The result prints the volume, the volume with waste, both parts, the coverage per litre and the ratio it applied.

What to Expect

Best for

  • Buying two-part resin for a floor, a bar top or a repair
  • Splitting a total volume into part A and part B
  • Checking a tin's stated coverage against your area

Not ideal for

  • A weight-based ratio, which needs the two densities
  • Pot life, working time or a maximum pour thickness
  • A multi-coat system where each coat has its own thickness

What this tool keeps

  • The area, thickness and ratio you typed
  • Both parts and the total, so the split can be checked

What may need cleanup

  • A ratio given by weight, which has to be converted to a volume ratio first
  • A thickness stated in mils, which has to become millimetres

Common errors

  • Entering a weight ratio as if it were a volume ratio
  • Forgetting that a second coat doubles the volume

Example use cases

  • Ordering resin for a garage floor coating
  • Splitting a bar-top pour between two tins
  • Checking a coverage figure at a different thickness

Sample input

Area 20 m², thickness 2 mm, ratio 2:1 by volume, 10 % waste.

Sample output

40 L before waste, 44 L with it, 29.3333 L of part A and 14.6667 L of part B.

Who this is for

  • Anyone ordering a two-part coating by area
  • A finisher splitting a pour across two parts

Frequently asked questions

Is the ratio by volume or by weight?

By volume, as you type it. Many tins give both, and they differ because the two parts have different densities. If your tin gives only a weight ratio, convert it first — this page has no densities to do it for you.

Why is 1 m² at 1 mm equal to a litre?

A litre is a cubic decimetre, and a square metre one millimetre deep is a thousandth of a cubic metre, which is a litre. That is why the volume line is area times thickness with no constant in between.

Does this tell me how long I have to work?

No. Pot life and working time depend on the product, the temperature and the mixed mass, and a thick pour cures faster and hotter. The page computes quantities for a process the product's data sheet governs.

What should the waste percentage be?

Enough to cover the mixing left in the bucket, the roller's pickup and the edges. It is applied to the volume before the split, so both parts grow together and the ratio stays the one you typed.