Concrete Mix Ratio Calculator

Split a wet concrete volume into cement, sand and aggregate for a nominal mix, waste included.

Privacy First
0 Runs
Updated 2026-11-06
No upload
Instant
No signup

The wet volume is multiplied by 1.54 for the dry volume and divided by the sum of the mix parts. Cement is priced at 1440 kg per cubic metre and bagged at 50 kg, in metric units.

A zero or negative volume is refused by name, and a waste percentage above 50 is refused. The page states that a nominal mix is not a designed strength, so the figures are an order, not a specification.

Every figure is an ordering estimate, not a structural specification, and none of it replaces an engineer's take-off. The arithmetic runs in your browser: nothing is uploaded and nothing is stored, so the same input prints the same answer on every reload.

The wet volume is multiplied by 1.54 for the dry volume and divided by the sum of the mix parts, with cement priced at 1440 kg per cubic metre and bagged at 50 kg. One cubic metre of a 1:2:4 nominal mix therefore reads 0.22 m³ of cement, 316.8 kg, 6.34 bags, with 0.44 m³ of sand and 0.88 m³ of aggregate; units are metric and your waste percentage scales the volume first.

Metric cement, sand and aggregate for a nominal mix, with waste applied to the volume.

An ordering estimate, not a structural specification.

How to use it

Choose the mix ratio, enter the wet volume in cubic metres and a waste percentage, then press Run. The page prints the dry volume, each material in cubic metres, the cement in kilograms and in 50 kg bags.

Waste and units

1.54 is the dry-to-wet factor for a nominal mix: the dry ingredients bulk up before water is added. Dividing by the sum of the parts gives each part's share, and cement is converted at 1440 kg/m³ and then to 50 kg bags, which is the unit it is actually sold in. Waste scales the wet volume before any of that, so the allowance reaches every material.

Where the page stops

A zero or negative volume is refused by name, and a waste percentage above 50 is refused. A nominal mix is not a designed strength: it says nothing about the water-cement ratio, the aggregate grading or the 28-day strength, so the figures are an order rather than a specification.

What to Expect

Best for

  • Ordering cement, sand and aggregate for a nominal mix.
  • Seeing cement in bags as well as kilograms.

What this tool keeps

  • The mix parts and the dry factor print, so the split can be rechecked at another volume.

What may need cleanup

  • Nothing: the three materials and the bag count are the whole output.

Sample input

1 m³ wet, 1:2:4 mix, 5 percent waste

Sample output

Wet volume with waste: 1.05 m³ Dry volume: 1.05 × 1.54 = 1.617 m³ Cement: 0.231 m³ = 332.6 kg = 7 bags Sand: 0.462 m³ Aggregate: 0.924 m³

Frequently asked questions

How much cement, sand and aggregate?

Pick a mix ratio, enter the wet volume in cubic metres and a waste percentage, then press Run. The page prints each material, and cement in bags as well as kilograms.

Is anything uploaded?

No. The arithmetic is local to this tab: nothing is sent, nothing is stored and no account is involved.

Is a nominal mix a strength specification?

No. A nominal ratio fixes proportions, not the water-cement ratio or the aggregate grading, so it cannot promise a 28-day strength. The page prints quantities and says so.

Is this a structural specification?

Every figure here is an ordering estimate, not a structural specification: it sizes a purchase, and an engineer's take-off or the manufacturer's data governs what is actually built.