Concrete Volume Calculator
Concrete volume for a slab or form in cubic metres and cubic yards, with waste included.
Volume is length times width times depth in metres, multiplied by one plus your waste percentage. The answer is printed in metric first, cubic metres, then cubic yards at 1.30795 per cubic metre.
A zero or negative length, width or depth is refused by the field it was typed in, because such a slab has no volume. The waste percentage is printed on the answer line rather than hidden in a constant.
Every figure is an ordering estimate, not a structural specification, and none of it replaces an engineer's take-off. The arithmetic runs in your browser: nothing is uploaded and nothing is stored, so the same input prints the same answer on every reload.
Volume is length × width × depth in metres, multiplied by one plus your waste percentage, printed in cubic metres first and then in cubic yards at 1.30795 per cubic metre. A 4 × 3 m slab at 100 mm with 5 percent waste therefore reads 1.26 m³, or 1.648 yd³.
Metric slab volume with waste, and the cubic yard figure beside it.
An ordering estimate, not a structural specification.
How to use it
Enter length, width and depth in metres and a waste percentage, then press Run. The page prints the raw volume, the volume with waste and the cubic yard equivalent.
Waste and units
The three dimensions are metric, so the product is cubic metres with no conversion step. 1.30795 is the exact cubic yard in cubic metres, so the second line is a conversion rather than a second estimate. Waste is a field rather than a constant, and it appears on the answer line so the ordering figure can be re-derived.
Where the page stops
A zero or negative length, width or depth is refused by the field it was typed in, because such a slab has no volume. The page does not deduct reinforcement displacement, does not add for a pump or a spill allowance, and does not know the sub-base.
What to Expect
Best for
- Sizing a slab pour in cubic metres and cubic yards.
- Seeing how much of the order the waste allowance accounts for.
What this tool keeps
- The raw and post-waste volumes both print, so the allowance is visible on its own.
What may need cleanup
- Nothing: the two volumes are the whole output.
Sample input
4 m × 3 m × 0.1 m, 5 percent waste
Sample output
Volume: 4 × 3 × 0.1 = 1.2 m³ With 5 percent waste: 1.26 m³ = 1.648 cubic yards
Frequently asked questions
How much concrete for my slab?
Enter length, width and depth in metres and a waste percentage, then press Run. The page prints cubic metres and the cubic yard equivalent.
Is anything uploaded?
No. The multiplication runs in this tab, so nothing leaves the page and nothing is kept.
Why is a cubic yard figure printed?
Because ready-mix is often ordered in cubic yards even where the dimensions are metric. 1.30795 is the conversion, not a second estimate.
Is this a structural specification?
Every figure here is an ordering estimate, not a structural specification: it sizes a purchase, and an engineer's take-off or the manufacturer's data governs what is actually built.
Build custom tools for your store
Join the SDK program to create useful ecommerce utilities for your store.